The sign is the easy part.
The date is not.

Shopfront work lives or dies on things that are not manufacturing: landlord sign-off, body corporate rules, centre trading hours, and a fitout date that everyone else is also working back from.

Book a leak check

The constraints

Everything that can
stop an install.

Whether the landlord has approved the design, whether the centre allows a daytime install, whether the permit is back, whether the shopfitter has finished. Each of those can hold a job, and each of them belongs on the job rather than in an email thread.

When one moves, the install date moves with it — and production order follows, instead of the job being built early and sitting wrapped in the corner.

Approvals

landlord and centre, tracked

Who has signed off and who has not, visible before the material is ordered rather than the week of install.

After hours

priced in, not absorbed

If the centre only allows an install after close, that is a cost and a crew constraint. It is on the quote because it was on the job.

Handover

opening day is the deadline

The date the shop opens is the one that matters. Everything else is scheduled backwards from it.